piksel
Helpline
AVAL KT 53

AVAL KT 53

adhesive for EPS application

AVAL KT 53
N1 paca stalowa gładka N1 paca stalowa gładka
N3  kielnia N3 kielnia
P1  na ściany P1 na ściany
P3  do wewnątrz P3 do wewnątrz
P4  na zewnątrz P4 na zewnątrz
W1  mrozoodporność W1 mrozoodporność
W2  wodoodporność W2 wodoodporność
5-ET  pięć Aprobat Europejskich 5-ET pięć Aprobat Europejskich

Product description

For application of thermal insulation boards – when the thermal insulation layer consists of expanded polystyrene boards (including boards with addition of graphite).
Element of the thermal insulation systems – an element of composite thermal insulation systems, granted the European Technical Approval (ETA).

Main properties

  • increased adhesiveness
  • good water vapour permeability
  • rapid strength increase
  • onto ceramic, concrete and silicate elements
  • BBA Certificate
  • NSAI Certificate

Main parameters

  • adhesion to concrete: min. 0.25 MPa
  • adhesion to expanded polystyrene: min. 0.08 MPa
  • consumption: from 4.0 to 5.0 kg/m²

USE

Go top
For application of thermal insulation boards – when the thermal insulation layer consists of expanded polystyrene boards (including boards with addition of graphite).
Element of the thermal insulation systems – an element of composite thermal insulation systems, granted the European Technical Approval (ETA).
Types of substrates: concrete of all classes, aerated concrete, cement or lime-cement plasters, sandstone and rough walls of bricks, blocks, hollow blocks and other ceramic or silicate materials.

PROPERTIES

Go top
Water vapour permeability.
Increased adhesion – ensures permanent binding with mineral substrates and insulation boards.
Characterized by rapid strength increase – sets in short time and enables commencing next technological stages fast.

TECHNICAL DATA

Go top
AVAL KT 53 is manufactured as a dry mix of cement binder, aggregates and modifying agents of the highest quality.
Bulk density (of dry mix)
ca. 1.47 kg/dm³
Wet density (after mixing)
ca. 1.48 kg/dm³
Dry density (after setting)
ca. 1.47 kg/dm³
Mixing proportions
water / dry mix
0.20 ÷ 0.22 l / 1 kg
5.00 ÷ 5.50 l / 25 kg
Adhesion to concrete
min. 0.25 MPa
Adhesion to expanded polystyrene
min. 0.08 MPa
Mortar preparation temperature, substrate
and ambient temperature during work
from +5°C to +25°C
Maturing time
ca. 5 minutes
Pot life
ca. 3 hours
Open time
min. 25 minutes

TECHNICAL REQUIREMENTS

Go top
AVAL KT 53 is an element of the AVAL external thermal insulation system which has been given:
-       the European Technical Approval no. 06/0187,
-       the National Standard Authority of Ireland (NSAI) Certificate no. 10/0347,
-       the British Board of Agrément (BBA) Certificate no. 13/5018

APPLICATION

Go top
Substrate preparation
The substrate should be frost-free, stable, flat and sound, i.e. sufficiently strong, cleaned of materials which might affect adhesion of mortar, especially dust, dirt, oil, grease, wax, residue of oil or emulsion paint. Before commencing repair work the substrate should be cleaned and — if excessively absorbent — primed with AVAL KT 17 (ATLAS UNI-GRUNT) emulsion. Priming is also necessary in the case of substrates such as weaker cement or lime-cement plaster or walls of aerated concrete or hollow cinder blocks. Larger rough spots and holes should be filled with ATLAS LEVELLING MORTAR, ATLAS ZW 330 or ATLAS PLASTERING MIX.
Adhesive preparation
Pour the mortar from the bag into a container with suitable amount of water (for proportions see Technical Data section) and mix until homogenous with a drill with a mixer. Leave the mortar to rest for 5 minutes and then remix. The ready to use adhesive
must be used up within ca. 3 hours.
Boards application
Apply AVAL KT 53 adhesive on the wall contacting side of the panel using the “strip - point” method. It consists in the application of continuous circumferential bead (at least 3 cm wide) at the edge of the board and 6÷8 patches of 8÷12 cm in diameter evenly distributed on the whole surface. In total, apply as much adhesive as sufficient to cover at least 40% of the surface of the board (after pressing down to the substrate, at least 60%) and to ensure appropriate binding of the board with the wall. Immediately after the application of the mortar on the board, fix the board to the substrate and strike it to place it in the required position, so that the mortar thickness under the board does not exceed 1 cm. In case of even and smooth substrates, the mortar can be evenly distributed with a notched trowel on the whole surface of the board to ensure 2÷5 mm of adhesive layer after fixing.

CONSUMPTION

Go top
Individual consumption of the adhesive depends on the properties of the substrate (e.g. evenness) and the technique of boards/panels application.
Boards application: from 4.0 to 5.0 kg/m².

IMPORTANT ADDITIONAL INFORMATION

Go top
• The mortar can be used to its full advantage when applied in conjunction with other elements of the system and according to the specified technique.
• Scaffolding covers should be used during installation work. Installation work should not be carried out in snowy or rainy weather or during strong wind.
• In case of fixing foamed polystyrene boards on weak substrates whose bearing capacity is hard to determine (e.g. unstable, dusty, difficult to clean), it is recommended to make an adhesion test. It consists in fixing of 8÷10 cubes of expanded polystyrene 10x10 cm each, in various places of the façade and checking the bonding after 3 days. Substrate resistance can be deemed sufficient if the foamed polystyrene cube tears during the attempt of removing it. If the cube is removed with
the mortar and substrate layer, it means that the substrate is not structurally sound enough. Further procedure for such case, e.g. the determination of the method of the weak layer removal should be described in the relevant technical design of the insulation.
• The tools must be cleaned with clean water directly after use. Difficult to remove residues of the set adhesive can be removed with the ATLAS SZOP agent.
• Irritant - contains cement. Irritating to respiratory system and skin. Risk of serious damage to eyes. May cause sensitisation by skin contact. Due to its form - powder, the product may cause mechanical irritation of eyes and respiratory system. Keep out of reach of children. Do not breathe dust. In case of contact with eyes, rinse immediately with plenty of water and seek medical advice. Wear suitable protective clothing, gloves and eye/face protection. If swallowed, seek medical advice immediately and show the container or label. Follow the instructions of the Safety Data Sheet.
• Content of soluble chromium (VI) in ready-to-use mix - ≤ 0.0002%.

TRANSPORT & STORAGE

Go top
The adhesive must be transported and stored in tightly sealed bags, in dry conditions (most preferably on pallets). Protect against humidity. Shelf life in conditions as specified is 12 months from the production date shown on the packaging.

PACKAGING

Go top
Paper bags: 25 kg
Pallet: 1050 kg in 25 kg bags

CAUTION

Go top
The above information constitutes basic guidelines for the application of the product and does not release the user from the obligation of carrying out works according to engineering principles and OHS regulations.
At the time of publication of this product data sheet all previous ones become void.
Date of update: 2015-02-04